Tuesday, August 10, 2010

A model progression…?

Here’s one to contemplate: How do we construct models that allow us to leverage the efforts of those that have used the model before us and increase the information in the model without losing information and keeping the model lean enough to function effectively?

Just because we are using a BIM authoring tool, doesn’t mean that we have removed all of the disconnected silos of information in the project delivery process. When a designer is in the early design stages they must be able to investigate space requirements and form fluidly. At some point they need to turn focus to constructability. That constructability must then be refined and documented. Then the project must be sequenced for construction with resources and tasks added to assemblies. Finally, the model should be prepped for handoff to the Owner (with linked O & M info, etc., etc.) At each of those steps we have the choice to follow the traditional handoff process that produces silos of information, or think (and maybe work) a little harder to craft a way to prevent handoff and tear down the silos.

Rarely will a resource tasked with creating CDs be able to use the same objects (such as walls) that were used at the SD and DD stages of the project. Similarly, it is uncommon for a GC to take a designer’s model and be able to use it to investigate constructability or arrange the information so it may be used for sequencing. Often the previous work is used as a template to create a whole new model in a separate file. Not so far from the silos of the “past.”

One of the AIA’s tools for IPD (Integrated Project Delivery) suggests that we add detail to the model as we go, using their Model Progression Spec (which you can download here.)

The MPS (Model Progression Spec (I swear, it really is always a TLA (Three Letter Acronym)) is a great document and provides a lot of guidance on what should be in a model.

from Vico's website

However, it lacks a definitive when. When an object should be “upgraded” to the next LOD (Level of Detail (told you, TLA.) I think the when almost needs to be decided on a project by project basis, but working backwards from a complete model and indentifying who needs the highest LOD (at this stage of the project) and the latest they can possibly receive it, will help you set deadlines. If you then work forward through those deadlines and find the earliest possible time you can make the decisions required to up that level of detail, you will be well on the way to having a workable Virtual Building modeling schedule. I know that’s just Critical Path Management (CPM (there’s another one) but you’d be amazed how everyone seems to throw out everything they have learned about delivering a project when “push come to shove” while learning a new tool/process. So let’s get back to some basics.

Vico Software also has some suggestions and examples of how to use the MPS (as well as something they call a content plan) when building a model. It’s worth looking into.

Anyway, my inspiration to write this post is to offer some suggestions about how you might add detail to your model without having to rework effort that has gone before. Since this has gotten kind of long, I’ll leave that for next time.

Thursday, September 25, 2008

AIA releases New Contract Docs for BIM and IPD

From a Press Release:

Washington, D.C., September 24, 2008 — The American Institute of Architects (AIA) today announced the upcoming release of six new AIA Contract Documents on October 17, 2008, including a new Building Information Modeling (BIM) exhibit, as well as two new Integrated Project Delivery (IPD) agreements, two new Design-Build agreements and a Scope of Services document. These new documents, collectively called the 3.5 Release, build on AIA Contract Documents’ 120 years of experience in defining the contractual relationships in the design and construction industry.



See the whole announcement here.

Wednesday, September 24, 2008

AIA Minnesota Bim Breakfast Club

The BIM Breakfast Club (BBC) meets once a month to discuss BIM, IPD, and the effect that they are having on the industry. Yesterday morning, (09/23/08) at 7:30 in the morning, this group of forward thinking Architects, Contractors, and other members of the construction industry got together to share what they had been doing over the summer and plan future meetings. Some of the topics discussed were:

A BIM Conference in Arizona this summer; There is talk that Arizona is putting language in it's public contracts that deal with BIM. The focus of the conference morphed from last year's "This is what BIM is" to "This is what we are doing."

The CIFE conference; Investigations in to metrics that quantify the benefits of BIM and IPD

The downstream use of models created in the design process; are current designer produced models (created to show design intent) useful for contractors (who use models to investigate constructability.)

My favorite fact from the meeting (from Mcgraw Hill I believe;) of the $2 trillion of business the US construction industry does, 54% is waste.

My favorite question of the meeting (in regard to Automated Code Compliance:) Do "Smart" resources make for "less smart" designers? How do intelligent BIM objects effect the design?
This reminds me of a Kurt Vonnegut book (Player Piano I believe) that speaks about automated design and it's effects on designers. Hmmmmm...

The plan for the next meeting is to discuss either legal issues and BIM or laser scanning. I encourage anyone who is interested in attending to contact one of the Co-Chairs;