Last week Sanford Rose Associates presented the most recent in their series of “Healthcare Design and Construction” webinars: “The BIM Mandate: Why Hospitals will require BIM for all future projects.”
I encourage anyone interested in the state of implementation of BIM and VDC in our industry to watch the recording of this two hour panel discussion. There is a cost ($139 per their website) but the information shared is worth far more.
The topic I found most interesting was the discussions by Ryan Hullinger from NBBJ about the Miami Valley Hospital in Dayton, Ohio (article here) and their use of offsite fabrication of MEP systems corridor racks as well as patient room devising walls that consisted of a toilet room mod, a casework unit and a pre-fabed headwall unit.
This is one of the few presentations where the participants gave some real quantitative metrics about how BIM effected the project.
Don’t get lost in the “Healthcare” part of the title. This information will be useful to anyone looking to keep up-to-date on what industry thought leaders are doing with BIM and VDC.
You can sign up to purchase the recorded webinar here.